top of page

kieran-taylor-i_-fZqpTA-E-unsplash

chris-turgeon-fYlgco8EpkA-unsplash

kieran-taylor-i_-fZqpTA-E-unsplash
1/2
Fulton Street, NY, NY 10038
Project Description:
The Fulton Transit Center is the MTA’s marketing name for a headhouse and update to the transfer corridors at the found Fulton Street stations. The project involves different glass fabrication procedures including tempering, heat soak test, lamination, insulation. Low-E and low iron is from PPG, which can achieve better performance.
Glass makeup:
FT6 + PVB1.52 + HS6 Solarban72 + 29A +
FT6 + PVB1.52 + HS6 + PVB1.52 + FT6



1/2
Fairbanks Airport
6450 Airport Way, Fairbanks, AK 99709
bottom of page